PRJT16-L2 – Microsoft Project 2016 Level 2

Price: $416.00 (ex. GST)
Code: PRJT16-L2
Duration: 1 Day
Location: Virtual Classroom (AEDT)
Enquire Now
Book Your Course
Clear
    Attendees
    Reset options

Introduction

Microsoft Project 2016 – Level 2 is designed for existing users of Microsoft Project who wish to extend their skills and knowledge beyond the creation of simple projects.

Prerequisites

Microsoft Project 2016 – Level 2 assumes that the learner can create basic and simple projects using Microsoft Project. It is also be beneficial for the learner to have a general understanding of personal computers and the Windows operating system environment.

Outcomes

After completing this course, students will gain the skills to:

  • use various techniques for levelling over allocation of resources
  • assign material resources in a project
  • assign and track costs within a project
  • apply constraints and deadlines to tasks in a project
  • track the progress of a project
  • work more productively with project views
  • work with tables in Project
  • work with some of the features that allow you to control your data
  • format projects to make them more appealing and relevant
  • print data from Gantt Charts in a variety of ways and presentations.

On-Site Training

If you need training for three or more people, ask us about training at your site. You can enjoy the convenience of reduced travel cost and time, as well as a familiar environment for your staff. Additionally, we can customise the course for your business needs.

  • Understanding Resource Levelling
  • Creating Resource Problems
  • Tracking Down Over Allocations
  • Checking Resource Usage
  • Creating an Over Allocation Report
  • Changing Work Effort
  • Understanding Overtime
  • Assigning Overtime
  • Hiring Contract Labour
  • Switching Work Assignments
  • Rescheduling Tasks
  • Assigning Fixed Material Consumption
  • Contouring Materials Usage
  • Adding More Material Assignments
  • Assigning Variable Usage Material
  • Adding To A Material Assignment
  • Checking Work For Materials
  • Understanding Project Costs
  • Reviewing Current Costs
  • Entering Variable Costs
  • Case Study Variable Costs
  • Assigning Daily Costs
  • Assigning Per Usage Costs
  • Assigning Fixed Costs
  • Assigning Material Costs
  • Using Another Cost Table
  • Applying a Different Cost Table
  • Changing Rates During a Project
  • Assigning Cost Resources
  • Viewing Project Costs
  • Understanding Constraints and Deadlines
  • Reviewing Our Project
  • Adding a Constraint
  • Using Elapsed Time
  • Rescheduling Tasks
  • Creating a Deadline
  • Moving a Project’s Start Date
  • Creating A Baseline
  • Automatically Updating Tasks
  • Manually Updating Tasks
  • Entering Delayed Tasks
  • Tracking Actuals On A Gantt Chart
  • Using The Tracking Box
  • Viewing Task Slippage
  • Understanding Project Views
  • Working With the Standard Views
  • Creating Split Views
  • Creating a Custom View
  • Creating a Custom Combination View
  • Using Custom Views
  • Customising the View Menus
  • Saving an Existing View
  • Deleting Unwanted Views
  • Keeping New Views Local
  • Working With Multiple Files
  • Hiding Open Files
  • Exploring Tables
  • Creating a New Table
  • Adding Fields Using Add New Column
  • Adding Fields Using Insert Column
  • Adding Simple Custom Fields
  • Formatting Table Fields
  • Creating a Simple Lookup Table
  • Using a Custom Table
  • Using a Hyperlink Field
  • Understanding the Data Tools
  • Basic Data Highlighting
  • Highlighting Date Ranges
  • Highlighting a Range of Tasks
  • Highlighting Tasks With Specific Resources
  • More Highlight Filters
  • Applying Filters
  • Creating a Custom Filter
  • Using a Custom Filter
  • Editing Existing Filters
  • Deleting an Unwanted Filter
  • Grouping Tasks
  • Using AutoFilters
  • Understanding the Timescale
  • Changing Time Periods
  • Showing Tiers
  • Modifying Specific Tiers
  • Formatting for Non-Working Time
  • Changing Text Styles
  • Working With Gridlines
  • Displaying Progress Lines
  • Working With Progress Lines
  • Changing the Layout
  • Understanding Gantt Chart Bars
  • Changing Gantt Chart Styles
  • Changing Bar Text
  • Formatting Selected Bars
  • Changing Bar Styles
  • Placing Printing Commands on the Ribbon
  • Using Print Preview
  • Setting Page Breaks
  • Printing Specific Dates and Pages
  • Printing Headers
  • Printing Footers
  • Working With the Legend
  • Getting the Right Report Fit
  • Exporting to PDF

Reviews

There are no reviews yet.

Enquire now

Enquire now

    Cart
    Unfortunately, Your Cart Is Empty
    Please Add Something In Your Cart